If a server is not working, try selecting another one above.
Rate it
Favorite
Critical Path
Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.
Released: 2026-07-10
Genre:
Casts: Russell Brand, Alan Arkin, Taraji P. Henson, Steve Carell, Pierre Coffin
Duration: 34 min
Country: United States of America
Production: Universal Pictures, Illumination Entertainment